1. Building Our Home

Part 2 -Framing and Windows

Framing of the House, Tyvek wrap, windows
Read More
2 November Installation of the windows in the late afternoon.
104 / 130

2 November Installation of the windows in the late afternoon.

20211102155643

  • 2 November Installation of the windows in the late afternoon.  Bath #1
  • 2 November Installation of the windows in the late afternoon.
  • 2 November Installation of the windows in the late afternoon.  Master bedroom transom.
  • 2 November Installation of the windows in the late afternoon.
  • 3 Nov 2021
  • 3 Nov 2021
  • 3 Nov 2021
  • 3 Nov 2021
  • 3 Nov 2021  Broken transom window  in master bedroom. Only the outside pane is broken. Looks like someone threw a rock.
  • 3 Nov 2021
  • Untitled photo
  • Untitled photo
  • Untitled photo
  • Untitled photo
  • Untitled photo
  • Untitled photo
  • 4 November Steps added at the bottom of the stairs.
  • 5 November 2021: Loft floor near bathroom slopes downward.
  • 5 November 2021: Loft floor  near the closet has a lip - plywood higher than the one next to it.
  • 5 November 2021: Loft floor  near the closet has a lip - plywood higher than the one next to it.
  • No Comments
  • Photo Sharing
  • About SmugMug
  • Browse Photos
  • Prints & Gifts
  • Terms
  • Privacy
  • Contact
  • Owner Log In
© 2023 SmugMug, Inc.